FRAME LANE/ST LUKES ROAD, DOSELEY, TELFORD

 

This David Wilson Homes development on part of the former Ennstone cement works in Doseley, Telford has been designed in phases. 

 

The first phase designed by Townscape Solutions (see photos) achieved detailed permission in November 2007 for 58 Dwellings on 2.1 ha with construction now complete. Constraints included a heavy tree belt limiting the developable area, a sewer splitting the site diagonally, adjacent industry and ecological constraints.

 

A masterplan for 460 units and open space drawn up by Townscape Solutions for the remainder of the site (see masterplan) was approved in outline in July 2013. Reserved matters for phase 2 have also been approved with construction now underway. 

 

Masterplan of the whole site
First phase street as built
First phase street as built
Aerial 3d view of the masterplan

Urban Design & Masterplanning